MTS Leader Floors
    Call Us Today(732) 889-9761
    Hardwood Floor Installation by MTS Leader Floors
    Hardwood Floor Installation in Long Branch & New Jersey

    Hardwood floor installation, done right from the subfloor up

    A new hardwood floor is only as good as what's underneath it. We check the subfloor for flatness and moisture before anything goes down, then install with the layout, seams and transitions planned ahead of time.

    Call (732) 889-9761

    15 Years of Experience · Based in Long Branch, NJ

    What's Included

    EVERY PART OF THE HARDWOOD FLOOR INSTALLATION JOB

    No loose ends handed off to you. The scope below is what your hardwood floor installation project includes from start to finish.

    • Old flooring removed and hauled out when the job calls for it
    • Subfloor checked for flatness, movement and moisture, and corrected before installation
    • Solid or engineered hardwood installed in the species and width you choose
    • Layout planned so board direction and seams land where they should
    • Transitions and thresholds finished at doorways and room edges
    • Work area cleaned and the floor walked with you before furniture goes back
    Why It Matters

    WHERE THIS HARDWOOD FLOOR INSTALLATION JOB EARNS ITS KEEP

    The subfloor gets checked first

    Most hardwood problems — gaps, cupping, squeaks — start underneath. We correct flatness and moisture issues before the first board goes down.

    Layout planned, not improvised

    Board direction, seams and transitions are mapped out before we start, so the finished floor reads as one continuous surface from room to room.

    Ready to refinish years from now

    Installed hardwood can be sanded and refinished down the road, and we handle that too, so the same company knows your floor from day one.

    How It Works

    THE HARDWOOD FLOOR INSTALLATION PROCESS, STEP BY STEP

    01

    Measure and assess

    We measure the space, check the subfloor, and talk through species, width, direction and finish.

    02

    Tear out and prep

    The old floor comes out where needed and the subfloor is corrected before installation starts.

    03

    Install

    Boards go in following the planned layout, with seams staggered and cuts placed where they belong.

    04

    Finish and walk through

    Transitions go on, the space is cleaned, and we walk the floor with you.

    FAQ

    HARDWOOD FLOOR INSTALLATION QUESTIONS, ANSWERED

    It depends on the room, the subfloor, and whether the space is above or below grade. We'll walk you through the tradeoffs at the estimate before you commit.

    Service Areas

    WHERE WE WORK

    Hardwood Floor Installation is available across New Jersey. See where we work and find out if we cover your town.

    View All Service Areas

    GET YOUR HARDWOOD INSTALLATION QUOTED

    10% off your flooring project

    Call (732) 889-9761